Sunday, 5,September,2010
Corporate Land
Residential
Commercial
 
CBD Perdana 1
  CBD Perdana 2
 
  SOHOs and Designer’s Boutique Suites @ CBD Perdana
  Shopping Complex / Retail Space
  Contact Sales Team
Property Management
Cyberview Lodge Resort & Spa
Setia Haruman Technology Sdn Bhd
  
  
  

 

 

 

 

 

 

 

 
 
introduction | layout plan | quality finishes | location | picture gallery | interactive map | 3D Flythrough | Registration
 
 
Type A / Type B / Type C
   
Type C
       
Structure
  Reinforced Concrete
   
Wall
 

Cement Bricks / Reinforced Concrete Wall /Gypsum Board Partition

   
Ceiling
  Skim Coat / Cement Sand Plaster / Mineral Fibrous Ceiling / Asbestos Free Ceiling
   
Door
  Metal Framed Glass Door (Main Entrance) / Metal Framed Roller
  Shutter (Ground Floor Rear Side Only)
  Fire Rated Door
  Timber Flush Door
   
Ironmongery
  Selected Quality Lockset
   
Window  
  Metal Framed Fixed Panel and Window  
     
Floor Finishes  
  Ceramic Tiles to Toilet  
  Cement Render at Others  
     
Wall Finishes  
  Toilets - Ceramic Tiles to Ceiling Height  
  Others - Cement Sand Plaster / Cement Plaster and Paint  
     
Sanitary Installation  
 
Pedestal W.C : 2 nos.
Kitchen Sink : 1 no. for Ground Floor Only
Tap Point and Outlet : to All Floors
 
     
Electrical Points  
 
 
13A Power Points
Lighting Points
Ceiling Fan Points
Air-cond Points
Telephone Outlets
Ground Floor
11
17
4
6
4
1st Floor
11
17
-
6
4
2nd Floor
11
17
-
6
4
3rd Floor
11
17
-
6
4
Floor 3A
11
17
-
6
4